WW27 River Survey Tracker

Water Work 2027 · drone survey of 304 km of river channel in Beed for GVT – Global Vikas Trust · Aerial Intelligence
Connecting to live status…
River surveyed (flown or later), of 304 km
0 km
0
flight paths flown
0
flights completed
0
paths waiting for a re-fly
Select a path on the map or in the list to see its details.

Progress by cluster

How each path moves from plan to delivery

Planned

1 · Plan

River lines from GVT's KML files are checked against the project sheet and the terrain, then cut into flight paths of up to 2 km of river. Every route is checked on the Digital Sky airspace map before the flying day.

Planned

2 · Ground control

The flight crew marks and surveys ground control points and checkpoints with survey-grade GNSS, so every model is tied to real coordinates and heights.

Flown

3 · Fly

An enterprise drone flies each path at 100 m above ground, covering a 100 m wide corridor along the river, launched from a point near the middle of the path.

Checked & backed up

4 · Check

The same evening the data is checked for coverage and positioning, copied twice, and any gap is scheduled for a re-fly the next morning.

Processing

5 · Process

Each river is processed as one block: aligned on its ground control, then built into the orthomosaic, 3D model and terrain model.

Delivered

6 · Deliver

Orthomosaic, 3D mesh, point cloud, surface and terrain models, contours, cross-sections, long sections, volume tables and the accuracy report.

Recent updates

No updates yet. Statuses appear here as the team records each flight.

Path names

WW27-DK-GNG-P071 Project · cluster (PA Parli–Ambajogai, MJ Majalgaon, DK Dharur–Wadwani–Kaij, AJ Ashti–Jamkhed) · river code · path number. The same name is used on the controller, the raw-data folder and the processed files.
Team sign-in